Proposed Temporary Road Closure – Totternhoe Road, Dunstable Central Bedfordshire Council have....
Skip navigation

Temporary Road Closure - Totternhoe Road, Dunstable - December 2018

Posted on October 11, 2018

This article was published in October 2018. Please see Latest News for more recent information.

Central Bedfordshire Council logoProposed Temporary Road Closure – Totternhoe Road, Dunstable

Central Bedfordshire Council have a request for a Temporary Road Closure at the above location to facilitate pre-surfacing patching/ surface dressing and resurfacing to take place safely.

The restrictions are to be in operation only when the necessary signs are erected on site. The Legal Order will be made to cover an 18 month period.  Access may be allowed from time to time according to local signing.

If you have any observations you wish to make please let the Streetworks Team at Central Bedfordshire Council know as soon as possible.

Road:
Totternhoe Road, Dunstable
Application from:
Central Bedfordshire Council Highways – 0300 300 8049
Reason:
Pre-surfacing Patching/Surface Dressing and Resurfacing
Length affected:
From junction Tring Road to junction Marina Drive
Date:
The closure will be in place for 2 days between on 1st December 2018 and 31st December 2018. Confirmed dates will be circulated nearer the time
Diversion Route:
Head south towards Tring Road/B489, Exit the roundabout onto Tring Road/B489. At the roundabout, take the 3rd exit onto Harling Road. Turn right onto Dunstable Road. Continue onto Church Road, Turn right onto Dunstable Road, and vice versa.

CBC 6842 - Diversion route during temporary road closure

Reader Comments

There are currently no comments about this article.